On Saturday Austin rented the wallpaper steamer again and finished taking the rest of the wallpaper down in the stairwell as well as the half bathroom on the main floor. Another messy job completed! Below are the before and after pictures plus a sample of the previous paper that was behind the panel in the stairwell.
Sunday, November 29, 2009
Weekend work projects
While Emily & I were busy decorating for Christmas, Austin was very busy completing some big home improvement projects. On Friday he installed a bath vent/fan in the upstairs "peach" bathroom. This required cutting holes in the ceiling and the side of the house and some creative wiring accomplished by crawling around in a very tight attic space and on the roof. After a long day's work we have a working vent fan with a timer switch, a real light switch for the vanity light and not one, but two GFCI outlets by the sink. Yay for handy husbands!
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment